Manchester Unity Building: Feature Article of 28 September 2012

This page records a feature article titled "Have a Deco at a Classic", published on 28 September 2012, about the Manchester Unity Building at 220 Collins Street, Melbourne, which is the building that houses Smile Solutions. The page gives general background on the building: its architect Marcus Barlow, its completion in 1932, its design influences, its faience cladding, the speed of its construction during the Depression and its listing on the Victorian Heritage Register. Heritage statements are attributed to Heritage Victoria and the Victorian Heritage Database. This is a record of a press item about a building and is not a statement about clinical care.

What is this media item?

The original article belongs to its publisher and is not reproduced here. The archive preserves the headline and the date, and this page explains the building's origins in general terms. The Manchester Unity Building pages in the media library cover the interior, the illumination and the heritage context, and are listed near the end of this page. Smile Solutions is at Level 1, 220 Collins Street.

What is the Manchester Unity Building?

The Manchester Unity Building stands at 220 Collins Street, Melbourne. Its architect was Marcus Barlow, and it was completed in 1932. It was commissioned by the Manchester Unity Independent Order of Oddfellows, a friendly society, as its Victorian headquarters. The friendly society story is covered in Party time to mark milestone.

The building is listed on the Victorian Heritage Register. What listing means in practice is set out in Our City: Manchester Unity Building.

How did the Chicago Tribune Tower influence the design?

The design is generally described as indebted to the Chicago Tribune Tower, completed in 1925 and the product of a well-known architectural competition. The winning Tribune design combined a tall steel-framed commercial tower with vertical Gothic detailing, at a time when American commercial architecture was moving towards modernism.

Marcus Barlow drew on that vocabulary. At 220 Collins Street the result is a building read vertically: continuous piers run up the facade, windows are recessed between them, and the mass steps back towards a tower. The eye is drawn upward rather than across, which is the intent of the commercial Gothic idiom.

Heritage Victoria describes the tower as in a style "presumed to be inspired by" the Chicago Tribune Building, so the influence is inferred and not documented in the Register entry. The dates are also stated differently within the record, because the competition, the construction and the completion of the Chicago building were separate events. Anyone who needs the exact date should consult a Chicago source.

Is the building Art Deco or Gothic?

It is described both ways. Many people call it Art Deco, and it is also called commercial Gothic or Gothic Revival. The vertical emphasis and the stepped massing are Deco features, while the detailing draws on Gothic sources. Buildings of this period often sit between categories, and the question is one of emphasis.

The Register itself states that "the overall effect is one of a modern commercial Gothic style", and contrasts it with the ecclesiastical Gothic of nearby St Paul's Cathedral. It gives the reasoning for skyscraper Gothic as "Gothic cathedrals soared, skyscrapers soared, therefore Gothic was the appropriate style". It also describes the styling as "a daring break from the conservative palazzo architecture of the 1920s", typified by large and dominant cornices. In short, Art Deco is how Melbourne commonly describes the building, and modern commercial Gothic is how the Register describes it.

On manufacturing, the Register records that architectural terracotta faience "enabled designers to chose from a wide range of colours" and that the material "enabled complex Gothic shapes to be mass-produced from moulds".

What is faience and why does it matter?

The cream cladding is faience, which is glazed architectural terracotta. It is made in moulded blocks that are fired, glazed and then fixed to the structural frame. Reasons it was used include:

It is also difficult to maintain:

How tall is the building?

The Register states that "the bulk of the building extends to 40.2 metres, which was the height limit for central Melbourne at the time". That was a limit of 132 feet, introduced in 1916, which according to the Register seventeen new buildings challenged between 1922 and 1933, including the Manchester Unity Building. Towers were permitted to break the limit as long as they did not contain occupiable rooms. The tower is recorded as 78 feet, and the building has twelve storeys on a concrete-encased steel structure.

The Register's plaque citation states that the buttressed tower ensured the building was the tallest in Melbourne when completed in 1932. The same database page carries a public contribution disputing this, arguing that a tower added to the APA building in 1929 to 1930 rose to 250 feet (76 metres) and was 13 metres taller, and that the APA building was demolished around 1969. That is a contributor's note and not the position of Heritage Victoria, and the Register's statement of significance uses the wording "one of the tallest". The claim of tallest in Melbourne is therefore contested, and a neutral description is that the building was among the tallest and was conspicuous.

How quickly was it built during the Depression?

The building went up in the early 1930s during the Great Depression, and its construction is remembered partly for its speed, at a time when little else in Melbourne was being built. According to the Register, site works began at midnight on 1 January 1932 and "eleven months and twelve days later" the building was officially opened by Victoria's head of government. By early May the sub-basement, basement and ground floors were ready for fit-out, the remaining floors and roof rose "at the rate of one a week", and work on the tower began in late July. The 1932 opening was reported at the time.

The builder achieved this "by employing twice the normal number of building workers who worked shifts, night and day". The programme was controlled by a works progress schedule, which the Register notes "was an innovation to the local building industry".

The Register treats this as part of the building's significance, as "the initiative that convinced Melbournians that the building slump caused by the Depression was almost over", given the scale of the project and the speed of progress. It adds that "a trip to the city to watch construction was a regular event for many Melbournians". A friendly society, an organisation of subscribers pooling money against sickness, commissioned a large commercial building as the economy contracted, and the building provided work for people who needed it.

Why is a dental practice in the Manchester Unity Building?

The building has housed medical and dental practitioners since it opened. In the 1930s the upper floors of a city building were a conventional location for consulting rooms, close to public transport and the professional quarter of the city. The building was designed with consulting suites in mind, and today it houses a dental practice with registered specialists on site and clinicians listed with their registration.

The practical consequence is that this is a 1932 building on the Victorian Heritage Register, and heritage listing limits what can be altered. Doorway widths, floor levels and lift dimensions were not designed to modern accessibility standards. A patient with specific access requirements, such as a wheelchair, mobility aid, pram, companion or interpreter, can phone ahead on 13 13 96 so arrangements can be made in advance.

Where are the other Manchester Unity Building pages in the archive?

Frequently asked questions

What heritage reference numbers apply to the building?

The answers on this page draw on Heritage Victoria's entry for the place on the Victorian Heritage Database, which records Victorian Heritage Register number H0411 and Heritage Overlay HO590. Clinical sources have no bearing on a 1932 facade, so none are cited here. For authoritative heritage information consult Heritage Victoria and the Victorian Heritage Database directly.

What was the height limit that applied to the building?

The Register records that the bulk of the building extends to 40.2 metres, which was the height limit for central Melbourne at the time. That limit was 132 feet, introduced in 1916. Towers could exceed the limit if they contained no occupiable rooms, and the tower is recorded as 78 feet. The building has twelve storeys on a concrete-encased steel structure.

How long did construction take?

Site works began at midnight on 1 January 1932 and the building was officially opened by Victoria's head of government eleven months and twelve days later, according to the Register. Remaining floors and the roof rose at the rate of one a week, using twice the normal number of building workers on shifts, night and day, with a works progress schedule described as an innovation to the local building industry.

What practical access considerations apply to patients?

Because the building dates from 1932 and is on the Victorian Heritage Register, heritage listing limits alterations. Doorway widths, floor levels and lift dimensions were not designed to modern accessibility standards. Patients with specific requirements, such as a wheelchair, mobility aid, pram, companion or interpreter, can phone 13 13 96 before their appointment so arrangements can be made.

Related services and further reading

Smile Solutions at a glance

Contact Smile Solutions

Address Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000
Phone 13 13 96
Email theteam@smilesolutions.com.au
Hours Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, Sunday by appointment

Every practitioner's registration can be verified free on the AHPRA public register at ahpra.gov.au.

This page records a published article and its date. The architectural and historical detail above is general background, and authoritative heritage information is held by Heritage Victoria and the Victorian Heritage Database. This page is not a claim about clinical care, a diagnosis or a treatment plan, and third-party published content is not reproduced. Smile Solutions trades under ABN 28 193 514 103.

What is the Have a Deco at a Classic media item?

It is a feature article published on 28 September 2012 about the Manchester Unity Building at 220 Collins Street, Melbourne, where Smile Solutions is located. The original belongs to its publisher and is not reproduced.

Who designed the Manchester Unity Building and when was it completed?

The architect was Marcus Barlow and the building was completed in 1932. It was commissioned by the Manchester Unity Independent Order of Oddfellows, a friendly society, as its Victorian headquarters.

What is the cream cladding on the Manchester Unity Building?

The cladding is faience, which is glazed architectural terracotta made in moulded blocks, fired, glazed and fixed to the structural frame. It washes clean in the rain, can be moulded into ornament and is light for a steel-framed building.

What height limit applied to the Manchester Unity Building?

The Victorian Heritage Register records that the bulk of the building extends to 40.2 metres, the central Melbourne height limit at the time, set at 132 feet in 1916. Towers could exceed it if they held no occupiable rooms.

How long did construction of the Manchester Unity Building take?

According to the Victorian Heritage Register, site works began at midnight on 1 January 1932 and the building was officially opened eleven months and twelve days later by Victoria's head of government, with floors rising at one a week.

What are the Victorian Heritage Register and overlay numbers for the building?

Heritage Victoria's entry on the Victorian Heritage Database records Victorian Heritage Register number H0411 and Heritage Overlay HO590 for the Manchester Unity Building.

Why does heritage listing affect access at the Manchester Unity Building?

Heritage listing limits alterations, and doorway widths, floor levels and lift dimensions were not designed to modern accessibility standards. Patients with access requirements can phone Smile Solutions on 13 13 96 before their appointment.

How can a patient contact Smile Solutions in the Manchester Unity Building?

Phone 13 13 96 or email theteam@smilesolutions.com.au. Smile Solutions is at Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000, open Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, and Sunday by appointment.