Manchester Unity Building Open House 2011, Part 2: Ground Floor Foyer

Part 2 of the Melbourne Open House Tour 2011 of the Manchester Unity Building covers the ground floor foyer of the Art Deco building on Collins Street, Melbourne, home to Smile Solutions since 2003. The Smile Solutions media library records the item under 1 July 2011 as part of a multi-part series. This page records that item and explains, in general terms, how a 1930s commercial entrance, foyer and lift lobby were designed, what they were made of, what restoration does to such spaces, and how patients reach Smile Solutions through the building today. The original item belongs to its publisher and is not reproduced.

What is this media item?

The original item is the property of its publisher and is not reproduced here. A duplicate record of the series opening is at MUB Open House: Part 1.

What does part 2 of the Open House tour describe?

The Open House description for part 2 reads: "The Manchester Unity Building, on the prominent Collins Street-Swanston Street corner, represents a rare blend of art, science, culture and commerce. It has a special place in the history of Melbourne and the hearts of its citizens." The committee of management of the building has been chaired by Dr Kia Pajouhesh since 2003, and it has been engaged in a program of staged renovations. The building opened on 1 September 1932, during the Great Depression, and Smile Solutions began restoring Level 1 on 1 January 2003 before opening the practice there on 1 September 2003.

Why did the entrance carry so much weight in a 1930s commercial building?

In a commercial building of the 1930s, the entrance did the work that advertising does now.

A prospective tenant, a visiting member, or a patient arriving for a consultation formed their view of the organisation in the first ten seconds, and that view was purchased in stone, metal and glass. The materials were the message: an institution that had spent this much on a doorway was an institution that would still be there in thirty years.

For a friendly society, that argument was the entire product. Manchester Unity sold the promise that it would pay out when a member fell sick. A lobby is a solvency statement. What the society actually did is set out in Party time to mark milestone and Manchester Unity Building.

What was a Deco commercial foyer made of?

The palette of the period, and what each material was doing. The style itself is described in Art Deco oasis in the heart of Melbourne and Have a Deco at a Classic.

The geometry is the giveaway. Deco ornament is stepped, chevroned, faceted and repeating, the same motifs at every scale, from the facade down to a lift grille. See Manchester Unity Building, Open House, part 5 on the cladding, and Manchester Unity Building, John Gollings on how such detail is recorded.

How did the lifts and lift lobby work?

The lift lobby was the second act of the arrival sequence, and in a tall building it mattered more than the door.

Passenger lifts of this era were attended, an operator worked the controls and announced the floors. The lift was a room, not a machine, and it was finished accordingly: panelled, mirrored, and lit.

The lobby had to hold a crowd. Lifts serve floors in sequence, so people wait; the space is sized and finished for waiting, and the indicator dials above the doors were made to be watched. The plant that drives them is covered in Manchester Unity Building, Open House, part 4.

And the building also had an escalator, which is a different proposition, continuous, unattended, and able to move a stream of people to the first floor. That combination, lift plus escalator, is what made a first-floor retail level viable. See The new shopping centre opens today and Inside the Manchester Unity Building.

The Smile Solutions practice records add that 60,000 visitors rode the building's "magic stairway" escalator on the opening day, 1 September 1932. The three restored lifts today carry people from the foyer up to the rooftop level.

What does restoration do to a foyer?

Entrance halls are a heavily altered part of many commercial buildings, because every change of ownership or tenancy tends to reach the front door first.

The common losses: original lighting replaced, directories removed, terrazzo covered with carpet or tile, panelling painted over, and services run across ceilings. The arcade shopfronts have the same problem, see Manchester Unity Building, Open House, part 3.

Restoration therefore involves as much removal as repair, taking off later layers to find what survives beneath, then deciding what to reinstate. Australian practice follows the Burra Charter: retain original fabric in preference to replacing it, make new work identifiable as new rather than disguising it as original, and keep interventions reversible. The sequence is set out in Manchester Unity Building, Open House, part 6.

Where the interior is included in a heritage registration, foyer works require a permit. Not every interior of a listed building is protected, the registration says which parts are. See Our City: Manchester Unity Building.

How do patients arrive at Smile Solutions through the foyer?

A practical note, since this page is about getting into the building.

Smile Solutions is on Level 1, 220 Collins Street. Access is via the building's lifts. See Our Location and Contact Us.

This is a 1932 building on the Victorian Heritage Register, and heritage listing constrains what can be altered, doorway widths, floor levels and lift dimensions were designed to the standards of the period.

If you have specific access requirements, a wheelchair, a mobility aid, a pram, a companion, an assistance animal or an interpreter, phone ahead on 13 13 96, and say what you need rather than what you have. Arrangements that are straightforward with notice are difficult improvised on the day. If the appointment rather than the building is the difficulty, see Dental Anxiety; for a child's first visit, First visit to the dentist.

And allow a few extra minutes. A city building with lifts serving many tenancies runs slower at 9am than the map suggests.

Which other parts are in the Open House series?

Frequently asked questions

When did the Manchester Unity Building open to the public?

The building opened on 1 September 1932, during the Great Depression. Practice records note that 60,000 visitors came on opening day and rode the escalator known as the "magic stairway". The building stands on the corner of Collins and Swanston Streets, opposite Melbourne Town Hall, and has been the home of Smile Solutions since 2003.

Which levels of the building does Smile Solutions occupy?

General and cosmetic dentistry is on Levels 1 and 10, Collins Street Specialist Centre is on Levels 8 and 12, Collins Street Imaging is on Level 9, and Collins Street Orthodontics is on Level 12 and the Tower. Patients arrive through the ground floor foyer and take the building's lifts.

What can a patient with access needs do before an appointment?

Phone the practice on 13 13 96 before the appointment and describe what is needed, whether that is a wheelchair, a mobility aid, a pram, a companion, an assistance animal or an interpreter. Arrangements that are straightforward with notice are difficult to improvise on the day, and the building's heritage listing limits some alterations.

Does the heritage listing change how patients move through the building?

Yes. The building is a 1932 building on the Victorian Heritage Register, and heritage listing constrains what can be altered, so doorway widths, floor levels and lift dimensions follow the standards of the period. Patients who want to know whether a route suits them can ask the practice before they travel.

Related services and further reading

Smile Solutions at a glance

Contact Smile Solutions

Address Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000
Phone 13 13 96
Email theteam@smilesolutions.com.au
Hours Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, Sunday by appointment

See also our team. Every practitioner's registration can be verified free on the AHPRA public register at ahpra.gov.au.

This page records a published item and its date. The architectural material above is general background rather than a summary of the item, and Heritage Victoria and the Victorian Heritage Database are the authoritative sources on the building's registration. It is not a claim about clinical care, a diagnosis or a treatment plan, and third-party published content is not reproduced. Smile Solutions trades under ABN 28 193 514 103.

What is part 2 of the MUB Open House series?

It is part 2 of the Melbourne Open House Tour 2011 of the Manchester Unity Building, covering the ground floor foyer, and is recorded in the Smile Solutions media library under 1 July 2011 as one item in a multi-part series.

What does the Open House description of the Manchester Unity Building say?

It describes the building, on the Collins Street and Swanston Street corner, as representing a rare blend of art, science, culture and commerce, with a special place in the history of Melbourne and the hearts of its citizens.

When did the Manchester Unity Building open?

The Manchester Unity Building opened on 1 September 1932, during the Great Depression. Practice records note that 60,000 visitors rode the escalator known as the magic stairway on opening day.

Who has chaired the Manchester Unity Building committee of management since 2003?

Dr Kia Pajouhesh, founder of Smile Solutions, has chaired the committee of management since 2003. The committee has been engaged in a program of staged renovations of the building.

When did Smile Solutions move into the Manchester Unity Building?

Smile Solutions began restoring Level 1 on 1 January 2003 and opened the practice there on 1 September 2003. Records note that this took eight months, the same period as the original construction in 1932.

How do patients reach Smile Solutions inside the Manchester Unity Building?

Smile Solutions is on Level 1 at 220 Collins Street, and access is through the ground floor foyer and the building's lifts. Patients with access requirements are asked to phone 13 13 96 before the appointment.

What materials were used in 1930s Deco commercial foyers?

Typical materials of the period included marble and scagliola wall linings, terrazzo floors, bronze and chromed metal doors and grilles, decorative plasterwork ceilings with concealed lighting, timber panelling and integral lettering designed as part of the fabric.

How can a patient contact Smile Solutions?

Phone 13 13 96 or email theteam@smilesolutions.com.au. Smile Solutions is at Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000, open Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, and Sunday by appointment.