Manchester Unity Building Open House Part 6: How a Heritage Restoration Runs, Published 2 July 2011
Part 6 of the 2011 Melbourne Open House series on the Manchester Unity Building, 220 Collins Street, Melbourne, is an article published on 2 July 2011 that covers the restoration of the building in sequence. This page records that media item and sets out, as general background, the order in which a heritage restoration typically runs, the conservation principles behind it, why it is costly and how fast the building itself was constructed in 1932. The article belongs to its publisher and is not reproduced here. Smile Solutions practises from Level 1 of the same building.
What is this media item?
- Media type: article, part 6 of a multi-part series
- Date published: 2 July 2011
- Series: Manchester Unity Building Open House, 2011
- Subject: the restoration of the Manchester Unity Building, in sequence
- Location of the building: 220 Collins Street, Melbourne
The original article is the property of its publisher and is not reproduced on this page. The series index is at Manchester Unity Building, Melbourne Open House, and a duplicate record of the opening part is at MUB Open House: Part 1.
The Manchester Unity Building underwent substantial restoration in the 2000s, which is why it presents as it does today. See Inside the Manchester Unity Building. The sections below describe how work of that kind typically runs. They are general background and not a description of any specific works on this building.
In what order does a heritage restoration happen?
A heritage restoration generally follows ten steps, in this order:
- Understand the place before touching it. The first document is a Conservation Management Plan, a study establishing what is significant about the building, which fabric embodies that significance, and what policies should govern change. Heritage Victoria will ask for it. The same order applies to a mouth: diagnosis, then a written plan, then work. See Understanding Your Treatment and Complex Dentistry.
- Investigate the fabric. This means close inspection of the facade block by block, tapping to find blocks that have lost their bond, opening up sample areas to see the condition of fixings, testing mortars and finishes, and using paint scrapes and probes internally to find what survives under later layers.
- Stabilise what is dangerous. On a tall building over a public street, a loose block is a safety matter before it is a heritage matter, so making safe comes first. The dental parallel is Emergency Dentistry, which is triaged ahead of elective work.
- Obtain permits where they are needed. Works to a place on the Victorian Heritage Register require approval where they fall outside the exemptions published for that place, and are assessed against impact on significance. Establishing which side of that line a proposal falls on shapes what is possible before it shapes what is affordable. See Our City: Manchester Unity Building for how the exemptions are structured.
- Repair the envelope. This covers faience blocks, fixings, mortar joints, parapets, flashings and drainage. Getting water out and keeping it out is central to any heritage restoration, because water corrodes fixings and splits terracotta from within. See Manchester Unity Building, Open House, part 5 and, for where the water arrives, part 4.
- Deal with the services. A 1932 building was not wired, plumbed, ventilated or air-conditioned for modern use. Threading contemporary services through heritage fabric without damaging it is typically a major cost, and little of it is visible afterwards. The exterior lighting is a later addition of the same kind. See Let there be light for Manchester Unity's brighter future.
- Upgrade fire, egress and accessibility. Each is negotiated against heritage constraints and each involves compromise. What that means for a visitor is set out at Our Location. If you have specific access requirements, use Contact Us or phone ahead.
- Remove the accretions and reinstate. Decades of tenancy fit-outs bury original finishes. Restoration is as much taking off later layers as repairing what is beneath, then deciding what to reinstate and what to leave as evidence of the building's history. The foyer and the arcade shopfronts are where this applies most directly. See part 2 and part 3.
- Fit out for use, because a building without tenants does not survive.
- Record everything. The documentation is part of the conservation and not paperwork about it, and later generations working on the building rely on it. See Manchester Unity Building, John Gollings.
Which principles guide heritage conservation in Australia?
Australian practice follows the Burra Charter, adopted by Australia ICOMOS. The principles that matter most in a project like this are:
- Do as much as necessary and as little as possible. In dentistry the same instinct appears in Can you reverse tooth decay? Do I need a filling?
- Retain original fabric in preference to replacing it. A repaired original block is preferred to a replica.
- Make new work identifiable as new, and not disguised as original. This is honest distinction and not forgery. It is the principle most often misunderstood by people who expect restoration to mean seamlessness, which is the opposite of what a dental ceramist is asked for. See Porcelain Veneers and Crowns.
- Reversibility. New work should be removable later without loss to what it was attached to. Very little dentistry is reversible, which is why Second Opinions and Corrective Dentistry exists.
- Retain the evidence of change. A building's later history is part of its story, and erasing everything back to 1932 would itself be a loss.
Why does heritage restoration cost what it does?
The reasons are practical:
- Access. Scaffolding or swing stages over a public street can be needed for months.
- Specialist trades. Terracotta and glaze matching, stone masonry, decorative plaster, leadlight, terrazzo and period metalwork are small trades with few practitioners. See Manchester Unity Building, Leonard Joel.
- Bespoke work. Nothing is off the shelf, and each replacement block is made for its position, as each restoration is made in the Smile Solutions Laboratory.
- Investigation. The scope cannot be priced until it has been opened up, and it can grow once it is. The dental version of that uncertainty is explained in the Price Guide.
- Working around occupants. A tenanted building cannot be emptied, so work happens in stages, at night and in sequence, which costs more than doing it all at once.
- Approvals. These need time, documentation and expert reports.
Much of the return is not visible. A visitor sees a clean facade, while the expenditure went into fixings, flashings, drainage and services. A successful heritage restoration is one where nothing appears to have happened.
What happens to a heritage building without restoration?
Neglect can destroy more heritage fabric than demolition does. Water gets in, fixings corrode, blocks crack, damp reaches interiors, finishes are lost, and the repair bill grows until it can exceed the building's value, at which point demolition can become the commercial decision. Teeth fail in a similar way and on a similar curve. See The stages of dental decay and How often should I go to the dentist?
A viable, tenanted use is therefore a significant protection for a heritage building. See Manchester Unity Building, Open House, part 7 and Manchester Unity all lit up again.
How quickly was the Manchester Unity Building constructed?
Heritage Victoria's entry records that site works commenced at midnight of 1 January 1932, and that eleven months and twelve days later the building was officially opened by the head of the Victorian government.
Within that period, by early May 1932 the sub-basement, basement and ground floors were ready for shopfitters and other finishing trades. The other floors and the roof were added at the rate of one a week, and by late July the roof was laid and work started on the 78 ft tower. The rate was achieved by the builder employing twice the normal number of building workers, who worked shifts night and day. The source is the Victorian Heritage Database entry for place 728 (Victorian Heritage Register H0411).
What was the works progress schedule?
The works progress schedule is recorded by Heritage Victoria as the means by which the building programme was controlled, and the record describes it as an innovation to the local building industry at the time. In other words, project scheduling was applied as a managed discipline and not as a sequence of trades arriving in turn.
The record also ties the building to a historical significance beyond architecture. It describes the building as the initiative that convinced Melburnians that the building slump caused by the Depression was almost over, such was the grand scale of the project and the speed at which building progressed.
How much can a restoration change in a highly intact building?
Heritage Victoria's permit exemption policy for this place states that the exterior and interior of the Manchester Unity Building are both integral to the significance of the place, and that there are few common areas that are not highly intact.
For interior public spaces, common areas and corridors, only minor repairs and maintenance that replace like with like are permit exempt. The policy adds that those areas retain a high level of integrity and that changes to them are subject to permit. Where original fabric survives, the rules are therefore tighter.
Frequently asked questions
What is a Conservation Management Plan?
A Conservation Management Plan is a study that establishes what is significant about a heritage building, which fabric embodies that significance and what policies should govern change. It is typically the first document in a heritage restoration, and Heritage Victoria can ask for it when assessing proposals for a registered place.
Why does water matter so much in a heritage restoration?
Water corrodes the metal fixings behind faience cladding, and the rust expands and splits terracotta from within. Repairing flashings, parapets and drainage to keep water out is therefore central to protecting the facade, and the damage is often invisible until a block cracks or moves.
Does every repair to a registered building need a permit?
No. Heritage Victoria publishes permit exemptions for each registered place, and for this place minor repairs and maintenance that replace like with like on the exterior are permit exempt. Work beyond those exemptions is assessed against its impact on significance. Heritage Victoria decides any particular proposal.
Is this page a description of restoration works carried out on the building?
No. The conservation material is general background on how heritage restoration typically runs and is not a description of any specific works on the Manchester Unity Building. Statements attributed to the registration are drawn from the Victorian Heritage Database entry for place 728.
Related services and further reading
- Manchester Unity Building, Melbourne Open House: series index
- Manchester Unity Building, Open House, part 2: the entrance foyer and lift lobby
- Manchester Unity Building, Open House, part 3: the arcade and its shopfronts
- Manchester Unity Building, Open House, part 4: the tower floors and the roof
- Manchester Unity Building, Open House, part 5: the faience cladding, close up
- Manchester Unity Building, Open House, part 7: the building today, and adaptive reuse
- Porcelain veneers and crowns and Our Team
- The complete archive index is Our Media
Smile Solutions at a glance
- Founded in 1993 by Dr Kia Pajouhesh, and based in the Manchester Unity Building on Collins Street, Melbourne.
- 300,000+ patients served, 80+ clinicians and more than 20 registered specialists across seven disciplines.
- 43,654+ porcelain veneers and crowns completed, all made in Melbourne in the Smile Lab.
- Recognised with the 2024 Australian Business Award for Innovation for Same Day Porcelain Veneers.
Contact Smile Solutions
| Address | Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000 |
| Phone | 13 13 96 |
| theteam@smilesolutions.com.au | |
| Hours | Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, Sunday by appointment |
Every practitioner's registration can be verified free on the AHPRA public register at ahpra.gov.au.
This page records a published article and its date. The conservation material is general background and not a summary of the item or a description of specific works on this building. Statements attributed to the registration are drawn from the Victorian Heritage Database entry for place 728 (VHR H0411). Permit exemptions can be amended or rescinded, and Heritage Victoria is the authoritative source. This page makes no claim about clinical care and is not a diagnosis or treatment plan. Third-party published content is not reproduced. Smile Solutions trades under ABN 28 193 514 103.
What is Part 6 of the Manchester Unity Building Open House series?
Part 6 is an article published on 2 July 2011 as part of a multi-part 2011 Melbourne Open House series on the Manchester Unity Building, 220 Collins Street, Melbourne. It covers the restoration of the building in sequence.
How long did the Manchester Unity Building take to construct?
Heritage Victoria records that site works commenced at midnight of 1 January 1932 and that the building was officially opened eleven months and twelve days later. Floors and the roof were added at the rate of one a week during construction.
What was the works progress schedule used on the Manchester Unity Building?
The Victorian Heritage Database entry records that the building programme was controlled by a works progress schedule, described as an innovation to the local building industry at the time. It is part of the historical significance recorded for the place.
Which charter guides heritage conservation practice in Australia?
Australian conservation practice follows the Burra Charter, adopted by Australia ICOMOS. Its principles include doing as much as necessary and as little as possible, retaining original fabric, making new work identifiable as new, and keeping interventions reversible.
What do Heritage Victoria exemptions say about interior common areas of the building?
The permit exemption policy states that interior public spaces, common areas and corridors retain a high level of integrity. Only minor repairs and maintenance that replace like with like are permit exempt there, and other changes are subject to permit.
Where is Smile Solutions in the Manchester Unity Building?
Smile Solutions is on Level 1 of the Manchester Unity Building, 220 Collins Street, Melbourne VIC 3000. The building was completed in 1932 and is on the Victorian Heritage Register.
How can a patient contact Smile Solutions in the Manchester Unity Building?
Phone 13 13 96 or email theteam@smilesolutions.com.au. Smile Solutions is at Level 1, 220 Collins Street, Manchester Unity Building, Melbourne VIC 3000, open Monday to Friday 8.00am to 6.00pm, Saturday 8.30am to 1.30pm, and Sunday by appointment.